The section of the brick fence
Height of the pillar 1875 mm or 25 rows (given the height of the CAP)
The size of one pillar 125 bricks or 0.24 m3
The height of the half brick wall 1725 mm or 23 rows (given the height of the CAP)
Span width 3510 mm
The size of one passage 311 bricks or 0.61 m3
Height of a socle 300 mm or 4 rows
Side of the fence
A
Number of Poles 9
Total posts 1125 bricks or 2.19 m3
All sorties 2717 bricks or 5.3 m3
The amount of the CAP 1615 bricks or 3.15 m3
The amount of the 5457 bricks or 10.64 m3
Solution for posts 0.43 m3
The solution to them 1.03 m3
Solution for the CAP 0.61 m3
The amount of concrete for the Foundation 5.32 m3
The amount of rockfill for Foundation 2.66 m3
The last flight of a partial 3000 mm
For equal need them: 8 pillars with a span 4375 mm or 9 pillars with a span 3889 mm
Side of the fence
B
Number of Poles 10
Total posts 1250 bricks or 2.44 m3
All sorties 3105 bricks or 6.05 m3
The amount of the CAP 1846 bricks or 3.6 m3
The amount of the 6201 bricks or 12.09 m3
Solution for posts 0.47 m3
The solution to them 1.17 m3
Solution for the CAP 0.7 m3
The amount of concrete for the Foundation 6.08 m3
The amount of rockfill for Foundation 3.04 m3
Side of the fence
C
Number of Poles 10
Total posts 1250 bricks or 2.44 m3
All sorties 3027 bricks or 5.9 m3
The amount of the CAP 1800 bricks or 3.51 m3
The amount of the 6077 bricks or 11.85 m3
Solution for posts 0.47 m3
The solution to them 1.14 m3
Solution for the CAP 0.68 m3
The amount of concrete for the Foundation 5.93 m3
The amount of rockfill for Foundation 2.96 m3
The last flight of a partial 3000 mm
For equal need them: 9 pillars with a span 4333 mm or 10 pillars with a span 3900 mm
Side of the fence
D
Number of Poles 5
Total posts 625 bricks or 1.22 m3
All sorties 1553 bricks or 3.03 m3
The amount of the CAP 923 bricks or 1.8 m3
The amount of the 3101 bricks or 6.05 m3
Solution for posts 0.24 m3
The solution to them 0.59 m3
Solution for the CAP 0.35 m3
The amount of concrete for the Foundation 3.04 m3
The amount of rockfill for Foundation 1.52 m3
The sum of all materials
Brickwork 20836 bricks or 40.63 m3
Solution for posts 11.79 m3
The solution to them 3.93 m3
Solution for the CAP 2.34 m3
Total solution 18.06 m3
Concrete for foundations only 20.37 m3
Filling for the Foundation of all 11.79 m3
© www.zhitov.com