General Foundation Drawing
Armature
Materials
Footprint of the foundation: 14.75 m2
The amount of concrete for the Foundation: 23.6 m3
All fixtures at the in 4 series: 442.2 m
The horizontal rows: 132 m
Vertical rods: 211.2 m
Connecting rods: 99 m
Connection: 66
The total weight of the valves: 392.39 kg
The area of formwork: 86.4 square meters
Lumber: 2.16 cubic meters
or 145 board length 6000 mm, width 100 mm
Costs
The required number of bags of cement on 50 kg: 166 or 8300 kg
The cost of cement 33200
sand 20750 kg
The cost of sand 6225
Gravel 29880 kg
The cost of gravel 11952
Boards 2.16 cubic meters
The cost of lumber 11880
Armature 392.39 kg
Room fittings 7847.8
Total: 71104.8