Calculation a self-leveling floors
Please indicate dimensions inna millimeters
X - room width
Y - room length
Tek measurements a di height difference inna di four corners a di room, at points
A, B, C, D.
Fi do dis, use a building level.
Set di minimum thickness a di self-leveling floor.
As a result, di volume a materials weh yuh need inna cubic meters ago be calculated an di heights inna di corners a di room ago be established.
Di program ago calculate di volume a materials fi di self-leveling floor, tek into account di height difference inna di corners.
Yuh wi be able fi more accurately calculate di cost a materials.
Calculation a self-leveling floor materials
Di main advantage a one self-leveling floor is dat di special leveling mixtures dem weh yuh use fi it create an even an smooth surface widout any extra effort pan yuh part. Dat a wai dem deh floors deh become especially popular today.
Yuh can fill di floors yuhself. All weh yuh need fi dis is fi know di length an width a di room, di height inna di corners, as well as di minimum thickness a di filling layer, afta weh wi program ago be able fi calculate fi yuh di volume a material to fill, tek into account di height difference.
Advantages of poured floors
1. Di surface a dem deh floors deh smooth, widout seams or gaps.
2. Di service life a self-leveling floors reach 40-50 years.
3. Wear resistance.
4. No need no special care.
Floor preparation
Laying a poured floor is quite simple, so many people prefer fi do it demself, widout turning to specialists. But deh deh some subtleties yah.
So, before yuh staat lay di floor, yuh need fi prepare di room. Fi do dis, dem tek weh di ole flooring, baseboards an doors. Di floor surface is leveled. Dis can be done using a special grinding machine or an iron brush. Den, if cracks deh inna di floor, dem need fi open wid a triangular scraper.
Memba seh if yuh a go lay a poured floor pan top a one wooden one, it shuda fos get reinforce wid a special mesh.
Afta dis, di angle a inclination a di floor is measured using a rod. According to dem measurements yah, dem mek marks pan di walls to weh height di floor ago be pour. Tu dis height, plus 2.5 centimeters, di walls dem clear a plaster an ada finishing materials.
Den di floor clean again an degreased wid a special powder.
Now di floor level wid mortar, cracks an crevices cover, an unevenness smoot out. Afta dis, di floor need fi be primed. An dis complete di preparatory stage. Yuh can staat lay di floor.
Laying a poured floor
Fi pour di floor evenly, mek a helper mix di solution wile yuh pour.
Prepare di solution according to di instructions pan di package. Fi mek sure seh di solution homogeneous, nuh pour all di wata inna di container at once. Mek dis be a big part a it. Mix di solution inna it. Fi do dis, it bes fi use a electric drill wid a special attachment. An only wen di solution turn into a homogeneous mass, pour di remaining water inna it.
Di floor is pour inna di direction a di door, fram di corner opposite to di entrance to di room. Pour di mixture inna portions, leveling di surface afta each using a needle roller. Dis help tek weh any air bubbles weh may get inna di solution an mek sure seh it even coating.
Fram pourin one portion to anodda, di time interval shudn't be more dan 10 minutes.
While di floor a dry, weh tek 3-6 hours depending pan di brand a solution, drafts an temperature changes inna di room shuda be avoided.