Please indicate di dimensions weh yuh need inna millimeters
X - Foundation width
Y - foundation length
A - foundation thickness
H - foundation height
C - distance to di axis a di jumper
A - foundation thickness
H - foundation height
S - step between connections
G - Horizontal rows
V - Vertical rods
Z - Connecting rods
Di amount a cement weh yuh need fi mek one cubic meter a concrete difrent inna each specific case.
Dis depends pan di brand a cement, di desired brand a concrete weh yuh produce, di size an proportions a fillers.
Indicated inna bags.
No need fi repeat how important it is wen yuh a design a house fi calculate di amount a building materials fi di foundation a di house.
Afta all, di cost a one monolithic foundation reach a third a di cost a di house.
Dis service ago mek it easier fi plan an calculate di foundation a one house.
It wi help yuh calculate di amount a concrete, reinforcement, an formwork boards fi install a strip foundation.
Weh yuh can find out:
Foundation area (fi egzampl, fi difain di amount a waataproofing fi kova a finish foundieshan)
Di amount a concrete fi di foundation an floor slabs or pouring di basement floor (it ago be fun wen, due to an elementary mistake inna multiplication, it nuh have enough concrete)
Reinforcement - quantity a reinforcement, automatic calculation a it weight based pan it length an diameter
Formwork area an quantity a lumber inna cubic meters an pieces
Area a �all surfaces (fi calculate foundation waterproofing) an side surfaces an base
Added calculation a di cost a foundation building materials.
Di program ago draw a drawing a di foundation tu.
Mi hope seh di service ago be useful to dem who build di foundation wid dem own han an construction specialists.
Concrete composition
Di proportions an quantities a cement, sand an crushed stone fi prepare concrete dem gi by default as a guide, as recommended by cement manufacturers.
Di same ting go fi di price a cement, sand, an crushed stone.
However, di composition a di finish concrete greatly depend pan di size a di crushed stone or gravel fractions, di brand a cement, di freshness an di storage conditions.
Please note seh di cost a sand an crushed stone deh inna di program fi 1 ton.
Di specific gravity a sand depend pan it origin.
1 cubic meter a sand weigh 1200-1700 kg, pan average - 1500 kg.
Wid gravel an crushed stone it more difficult. According to various sources, di weight a 1 cubic meter is fram 1200 to 2500 kg, depending pan di size. Heavier - smaller.
So yuh wi haffi recalculate di price fi each ton a sand an crushed stone yuhself or check wid sellers.
However, di calculation will still help yuh find out di approximate costs a building materials fi pour di foundation.
No figet di wire fi tie reinforcement, nails or screws fi formwork, delivery a building materials, costs fi excavation an construction work.