Calculator Yuh calculations Entrance
patwa

Calculation a di amount a columnar foundation materials


drawing scale 1:

Specify pole type



Specify di dimensions a di foundation pillars

Base height A
Pole height H

Size B
Size B1
Size D
Size D1

Rebar bars inna columns ARM1

Specify di dimensions a di foundation

wit X
Lent Y
Number a pillars X1
Number a pillars Y1

Pillars unda di whole house S

Please indicate di dimensions a di grillage

wit E
Height F

Number a rows a reinforcement ARM2
Reinforcement diameter ARMD

Concrete composition

Cement per cubic meter a concrete

Concrete proportions by weight
cement : san' : crushed stone
: :

Indicate di cost a building materials

cement (per bag 50 kilograms)
san' (fi 1 ton)
crushed stone (fi 1 ton)
Armature (fi 1 ton)






Calculation a di amount a columnar foundation materials


Calculation a di amount a columnar foundation materials
Select foundation pillar type

Dem can be pillars wid a round or rectangular base. An wid a round or rectangular main part.

Please indicate dimensions inna millimeters

B - Width or diameter.
H - Height a di main part.

A - Di height a di base a di pillar. If di pile is widout a base, den nuh indicate dis size.
D - Width or diameter a di base.

D1 - Length fi rectangular base.
B1 - Width fi a rectangular post.
Fi round sections, dem dimensions yah no deh inna di calculation.

Dimensions of a columnar foundation

X - Foundation width.
Y - Foundation length.

X1 - Number a pillars inna width, including pillars inna di corners.
Y1 - Number a pillars along di length, including pillars at di corners.

S - If yuh check, pillars wi be calculated weh evenly spaced unda di entire house. If not, den di pillars dem only deh roun di perimeter a di foundation.

Grillage dimensions

E - Grillage width.
F - Grillage height.
If calculation a one monolithic grillage no required, den no indicate dem dimensions yah.

Armature

ARM1 - Di numba a reinforcement bars inna one column.
ARM2 - Di numba a rows a reinforcement inna di grillage strip.
ARMD - Diameter of fittings. Always indicated in millimeters.
If reinforcement no need, den set di values ​​to 0.

Indicate di amount a cement fi produce one cubic meter a concrete. Inna kilograms.
Indicate di proportions fi mek concrete, by weight. Dem data deh vary inna each specific case.
Dem depend pan di brand a cement, di size a crushed stone an construction technology. Check wid yuh building materials suppliers.

Fi calculate di estimated cost a building materials, indicate dem prices.

As a result, di program ago automatically calculate:
Di distance between di foundation pillars an dem numba.
Di volume a concrete fi one pillar, separately fi di upper an lower parts.
Di amount a concrete fi di grillage.
Di length an weight a di amount a reinforcement weh yuh need.
Di cost a building materials fi di construction a one monolithic columnar or pile foundation wid a grillage.
Di drawings dem ago gi yuh a general idea an help inna di design a pile foundations.


Fi bathhouses an houses widout basements, houses wid light walls an brick houses, weh it no economical fi use a strip foundation, a columnar foundation is often used. It calculation is labor-intensive, but wid wi program di calculations naa go tek much a yuh time. All yuh need is fi fill out di appropriate fields according to di instructions, an yuh wi get information bout di materials weh yuh need fi construction, find out dem quantity an total cost.

Brief description

A columnar foundation have di form a pillars, weh dem united using a grillage. Demya pillars deh inna di corners a di future building, as well as at di intersections a walls, unda load-bearing or simply heavy walls, beams an critical structures. Inna places weh di load is especially high. Di grillage serve fi strengthen di columnar foundation, an it have di appearance a one reinforced lintel between di pillars.

Weh yuh shudn't use a columnar foundation

It no recommended fi use a columnar foundation weh have mobile or weak soils, such as peat or water-saturated clay soils. Yuh shudn't use dis type a foundation inna areas weh have a sharp difference inna height.

Advantages

Di columnar foundation have a nomba a advantages weh mek it di optimal solution fi di construction a one private house. It cheaper dan a strip or slab foundation, more economical in terms a di consumption a building materials an di cost a it construction, gi less shrinkage an allow yuh fi reduce di total area a di foundation.

Materials

Dipen pan di weight an numba a storeys a di house, materials fi mek di foundation shuda be select. Dis a stone, brick, concrete an reinforced concrete. According to di type a material, di minimum cross-sectional size a di pillars dem select. So, fi concrete pillars di cross-sectional size shudn't be less dan 400 mm, fi stone masonry no less dan 600 mm, fi brick masonry 380 mm if it deh above ground level, an fram 250 mm if ligation technology is used.

Construction a di foundation

Bifuo yuh staat bil, yuh haffi find out di depth a soil freezing, di type an composition a di soil fi replace it if necessary, an di level a groundwater fi identify di need fi drainage an waterproofing. Di construction a one columnar foundation proceed inna 9 successive stages.
1. Preparatory work, weh a di cleaning a di construction site.
2. Marking di foundation, wen di lan plot is marked according to di project.
3. A dig holes.
4. Installation a formwork fi pillars.
5. Installation a fittings.
6. Pouring of pillars.
7. Mek a grillage.
8. Construction a di so-called fence or barrier wall between di pillars.
9. Foundation waterproofing measures.

Important points

If a house a get build pan heaving soils, den construction cyaan be postpone. If yuh lef an empty foundation ova di winta, it can become deformed.
Newly poured concrete supports haffi sit fi 30 days. It no recommended fi load dem during dis period.
Fi di production a concrete, cement grade M400 is optimal, an fine gravel an coarse sand dem use as filler.

zhitov Author of the project: Dmitry Zhitov
fb vk

© 2007 - 2024

Google Play
Privacy Policy
Yuh nuh have no saved calculations yet.
Register or log in fi be able fi save yuh calculations an send dem by mail.
русский afrikaans العربية беларуская български català česky cymraeg dansk deutsch ελληνική english español eesti euskal فارسی suomi français gaeilge galego עברית hrvatski magyar indonesia íslenska italiano 日本語 한국어 lietuvių latviešu македонски melayu malti nederlands norsk polski português brasileiro română slovenčina slovenščina shqipe српски svenska kiswahili าษาไทย filipino türkçe українська việt ייִדיש 简体 繁體 հայերեն azərbaycan საქართველოს kreyòl ayisyen বাঙ্গালী hmoob latin esperanto हिन्दी తెలుగు ગુજરાતી ಕನ್ನಡ தமிழ் اردو қазақ монгол тоҷик o'zbek bosanski ລາວ नेपाली සිංහල ị̀gbò èdè yorùbá malagasy ဗမာစာ ខ្មែរ ਪੰਜਾਬੀ मराठी മലയാളം sugboanon sunda isizulu jawa chicheŵa hausa maya yucateco кыргыз አማርኛ kurmancî lëtzebuergesch پښتو सिन्धी samoa gàidhlig isixhosa chishona frysk af-soomaali sotho corsu hawaiʻi māori ଓଡ଼ିଆ kinyarwanda türkmen ئۇيغۇرچە татар aymara অসমিয়া بامبارا भोजपुरी oluganda ava-ñe’ẽ डोगरी ilokano qhichwa कोंकणी krio سۆرانی lingála मैथिली މޯލްޑިވިއަން އެވެ ꯃꯤꯇꯩꯂꯣꯟ mizo ṭawng afaan oromoo संस्कृत- sesotho sa leboa ትግርኛ xitsonga twi ɛ̀ʋɛ̀gbè basa jawa аԥсуа अवधी авар dho-alur qafar aceh acholi basa bali baule башҡорт بلوچی chibemba betawi bikol brezhoneg буряад waray tshivenda wolof دری རྫོང་ཁ་ thuɔŋjäŋ chidombe julakan iban 粵語 kànùrí kapampangan karo kiga kikongo kituba kokborok коми qırımtatar khasi latgaļu liguru limburgs lombard марий dholuo kreol morisien madhurâ mangkasaraʼ بهاس جاوي mam मारवाड़ी majõl minangkabau gaelg chindawu isindebele नेवा ߒߞߏ naadh occitan ӕвзаг pangasinan پنجابی papiamento português kirundi sängɔ ᱥᱟᱱᱛᱟᱞᱤ diidxazá siswati davvisámegiella seselwa ślōnskŏ simalungun sicilianu sosoxui tahiti tamazight ⵜⵉⴼⵉⵏⴰⵖ tetum བོད་སྐད་ tiv batak toba tok pisin tonga setswana тыва ತುಳು tumbuka nawatlajtoli удмурт føroyskt vakaviti fɔ̀ngbè furlan fula ilonggo hunsrückisch kachin romaňí chamoru нохчийн laiholh чӑвашла chuuk လိၵ်ႈတႆး саха patwa vèneta kalaallisut qʼeqchiʼ