Calculator hmanga siam a ni I chhut dan te Luhka
mizo ṭawng

Foundation slab hmanrua chhiar dan


scale lem ziah 1:

Dimensions chu millimeter-ah tarlan rawh

Slab san zawng a ni B
Dung Y
vang X

formwork siam a ni

Formwork board a thuk zawng a ni T
Board sei zawng a ni L
Board zau zawng a ni H

fittings te pawh a awm

Cell sei zawng Z
Cell zau zawng W
Diameter a ni D
Row awm zat R

Concrete siam dan (composition) a ni

Cement bag 1 a ni m3 sakhat M
Bag khat rit zawng K

Concrete a proportion hrang hrang
cement hmanga siam a ni : vut : rubble (rubble) a ni a rih zawng a zirin

: :

In sakna hmanrua man a ni

cement hmanga siam a ni (bag khatah a awm)
vut (1 ton a ni)
rubble (rubble) a ni (1 ton a ni)
Chuang (cubic meter 1 khatah a ni)
fittings te pawh a awm (ton 1 man a ni)





Foundation slab atanga chhut chhuah


Dimension mamawh chu millimeter-in tarlang rawh

Foundation slab atanga chhut chhuah Y - base plate sei zawng a ni
X - slab zau zawng a ni
B - foundation slab atanga a san zawng zawng zawng

Foundation slab hmanrua chhiar dan Z - Cell sei zawng
W - Cell zau zawng
D - Rebar diameter a ni
R - reinforcement-a horizontal row awm zat
Если расчет арматуры вам не требуется, то оставьте это поле пустым.

Concrete cubic meter khat siamna atana cement mamawh zat chu a chi hrang hrangah a inang lo.
Cement grade, concrete lo chhuak tur grade duh dan, filler lian leh te a innghat a ni.

M - concrete cubic meter 1 atan cement bag engzat nge mamawh
K - cement bag khat kilogram-a rit a ni

T - Formwork board a thuk zawng a ni
H - Board zau zawng a ni
L - Board sei zawng a ni

I bial chhunga thil hman man tur chu tarlang rawh.

Bulk material man chu volume anga ni lovin, a rit zawnga man anga chhut leh tur a ni tih hre reng ang che.
Shallow foundation chi khat chu monolithic foundation slab a ni.
A tlangpuiin chutiang foundation chu monolithic concrete slab a ni a, chu chu ​​the house area zawng zawng hnuaiah a awm a ni.
Slab foundation-a load awmte deformation awm lo perception atan chuan volume chhung zawngah spatial reinforcement hman a ngai a ni.
An dahna tur hian foundation chi hrang hrang hmanlai nena khaikhin chuan concrete leh reinforcement hman tam zawk a ngai a, chuvangin a man a to deuh hlek a ni.

He program hian eng nge chhut chhuahnaah a ṭanpui ang?

Slab chhunga concrete theh tur volume.
Concrete siamna atana hmanraw mamawh zat - cement, sand, lung chi hrang hrang.
Formwork atana board mamawh zat.
In sakna hmanrua zawng zawng man tur ruahman.
Foundation slab tihchakna hi leilung dinhmun leh project-ah a innghat a ni.

zhitov Author of the project: Dmitry Zhitov
fb vk

© 2007 - 2024
Application hi hnathawh a awlsam zawk
Google Play
Thuruk humhalh dan tur
Saved calculation i la nei lo.
I calculation te save theih nan leh mail hmanga thawn theih nan register emaw login emaw rawh.
русский afrikaans العربية беларуская български català česky cymraeg dansk deutsch ελληνική english español eesti euskal فارسی suomi français gaeilge galego עברית hrvatski magyar indonesia íslenska italiano 日本語 한국어 lietuvių latviešu македонски melayu malti nederlands norsk polski português brasileiro română slovenčina slovenščina shqipe српски svenska kiswahili าษาไทย filipino türkçe українська việt ייִדיש 简体 繁體 հայերեն azərbaycan საქართველოს kreyòl ayisyen বাঙ্গালী hmoob latin esperanto हिन्दी తెలుగు ગુજરાતી ಕನ್ನಡ தமிழ் اردو қазақ монгол тоҷик o'zbek bosanski ລາວ नेपाली සිංහල ị̀gbò èdè yorùbá malagasy ဗမာစာ ខ្មែរ ਪੰਜਾਬੀ मराठी മലയാളം sugboanon sunda isizulu jawa chicheŵa hausa maya yucateco кыргыз አማርኛ kurmancî lëtzebuergesch پښتو सिन्धी samoa gàidhlig isixhosa chishona frysk af-soomaali sotho corsu hawaiʻi māori ଓଡ଼ିଆ kinyarwanda türkmen ئۇيغۇرچە татар aymara অসমিয়া بامبارا भोजपुरी oluganda ava-ñe’ẽ डोगरी ilokano qhichwa कोंकणी krio سۆرانی lingála मैथिली މޯލްޑިވިއަން އެވެ ꯃꯤꯇꯩꯂꯣꯟ mizo ṭawng afaan oromoo संस्कृत- sesotho sa leboa ትግርኛ xitsonga twi ɛ̀ʋɛ̀gbè basa jawa аԥсуа अवधी