Foundation-a general drawing siam a ni
fittings te pawh a awm
thil hmanrua te
Foundation base awmna hmun a ni: 14.75 m2
Foundation atana concrete volume awm zat: 23.6 m3
Laying laiin total reinforcement a ni chhung 4 tlar: 442.2 meter a ni
row horizontal (horizontal row) te a awm: 132 meter a ni
Vertical rods te pawh a awm: 211.2 meter a ni
Connecting rods te pawh a awm: 99 meter a ni
Connection hrang hrangte: 66
Reinforcement rit zawng zawng: 392.39 kg
Formwork awmna hmun a ni: 86.4 square metre a ni
lumber tih a ni: 2.16 cubic meter a ni
emaw 145 boards a sei hle 6000 mm, vang 100 mm
Hmaralna
Cement bag mamawh zat a zirin 50 kg: 166 emaw 8300 kg
cement man a ni 33200
vut 20750 kg
sand cost a ni 6225
rubble (rubble) a ni 29880 kg
rubble man a ni 11952
Chuang 2.16 cubic meter a ni
lumber man a ni 11880
fittings te pawh a awm 392.39 kg
Reinforcement senso a ni 7847.8
Belhkhawm: 71104.8
© www.zhitov.com