Column lungphum lem ziah
Column lungphum lem ziah
lungphum lungphum a ni
lungphum lungphum a ni

Column chunglam volume a ni 0.038 m3
Base volume a ni 0.025 m3
Column volume zawng zawng 0.063 m3

Post inkar hlat zawng chu horizontal-in a awm 1450 mm
Post inkar hlat zawng (vertical distance) a ni 1433 mm
Foundation pillar awm zat 20 thilte

Pillar zawng zawng concrete volume 1.257 m3
Grillage atan concrete volume a awm 0.606 m3
Concrete volume zawng zawng 1.863 m3

Reinforcement sei zawng chu column khatah a awm 4.2 m
Column hrang hranga reinforcement awm zat 84 m
Grillage chhunga reinforcement awm sei zawng 84 m
Reinforcement hun chhung zawng zawng 168 m

Reinforcement rit zawng zawng 149.08 kg

Foundation sakna tur bungrua senso

Cement bag mamawh zat chu kg 50 a ni: 13.04. (emaw 652.05 kg)
cement man a ni 2608.2

vut 1630.13 kg
sand cost a ni 489.04

rubble (rubble) a ni 2347.38 kg
rubble man a ni 938.95

Reinforcement senso a ni 2981.6

Belhkhawm: 7017.79